P118/1:2025 — the framework code for smoke ventilation
P118/1:2025 is the Romanian regulation that guides smoke-ventilation sizing. For ordinary rooms and smoke reservoirs it allows a simplified method (art. 8.7), applicable to natural extraction (Table 121); non-standard cases — malls, large atria, industrial buildings or complex geometries (art. 8.1.2(1)) — require the complex method based on SR CEN/TR 12101-5 and a licensed designer.
The starting point of any sizing is the fire risk, classified by the fire load density q (art. 2.1.2.2(1)): low (q ≤ 420 MJ/m²), medium, high and very high.

